    You are currently viewing our boards as a guest which gives you limited access to view most discussions and access our other features. By joining our Free Brahmin Community you will have access to post topics, communicate privately with other members (PM), respond to polls, upload content and access many other special features. Registration is fast, simple and absolutely free so please, join our community today!

    If you have any problems with the registration process or your account login, please contact contact us.

Solar Electricity

Status
Not open for further replies.
This makes interesting reading. I would like people with knowledge about the solar technology for production of electricity to discuss this here. There are several gaps in what is said in this article. Can someone write up a post analysing this?

[TABLE="width: 589"]
[TR]
[TD="width: 589"]
100,000MW of costly solar power can sink ‘Make in India’
[h=6]Swaminathan S Anklesaria Aiyar[/h]
The Times of India
Published on July 5, 2015
[/TD]
[/TR]
[TR]
[TD="width: 589"] Narendra Modi has raised the target for solar electric capacity from 20,000MW to 100,000MW by 2022 at a cost of maybe $100 billion. This is a serious blunder. It will sabotage his “Make in India” plans by technically disrupting the whole electricity grid, and raising the cost of a critical manufacturing input— electricity. India already has the highest interest rates among its Asian competitors. Its new land law will raise land prices maybe fourfold, making India uncompetitive there too. Indian electricity has long been uncompetitive: bulk power costs Rs 6-7/unit or more in most states, one and a half times as much as in competing Asian countries. Solar power will be even more expensive, despite massive subsidies. So, “Make in India” will take a hit. As long as solar power was a small fraction of total power supply, its national impact was marginal. Experimentation with various solar technologies made sense, preparing for the day when solar power would finally become competitive. Its cost has halved in the last decade, but needs to halve again. However, 100,000MW of solar power by 2022 will constitute maybe a quarter of total power capacity. This will upset the whole grid, since solar power disappears when the sun sets, just as electricity demand rises to its daily peak, with homes switching on lights and stoves. Meeting peak needs will require a big cushion of idle thermal power during the day, a huge hidden cost of solar power. Since 100,000MW of solar power by 2022 will disrupt the grid and raise electricity costs for manufacturers, we must ask: what’s the hurry? Why not wait till solar power becomes competitive, and then go all out? Steel or cement manufacturers will tell you, if new developments promise to will halve costs five years hence, it would be mad to invest today. Yet that madness is proposed for solar power. Solar electricity is most promising. But it is also hugely subsidized today. Stripped of subsidies, solar power currently costs 14 cents/unit (around Rs 9.5/unit). With subsidies, solar producers have been able to reduce their bids substantially in recent years. Adani has just signed a deal in Tamil Nadu to supply solar electricity at Rs 7.01/unit. But add transmission and distribution costs, various levies, plus cross-subsidies for farmers and homes, and bulk power for industry will cost Rs 9/unit. That is prohibitive and will make users uncompetitive. Big companies producing captive power from captive coal mines say their electricity costs just Rs 2/unit. This will go up a bit after high auction prices for new captive mines, but will remain far below even subsidized solar power. But not every manufacturer can generate captive power. Most state electricity boards are bust, with accumulated losses approaching Rs 3,00,000 crore. Some electricity distribution companies refuse to buy even small amounts of expensive solar power that they are mandated to buy, and many refuse even cheap conventional power for want of funds. So, who can credibly guarantee that they will actually pay for Modi’s huge additions of costly solar power? Being non-polluting, solar power deserves some price preference. But it already enjoys huge preferences. Taxes, cesses, royalties and auction prices are levied on fossil fuels. Equipment for thermal power and coal mining equipment is taxed, while solar equipment is highly subsidized and mostly duty-free. Solar costs have plummeted recently with new technologies and scale economies. Hopefully this will continue, but it’s not guaranteed. The US gave large subsidies to a glamorous solar company Solyandra, hailed as a US champion by Obama. Alas, Solyandra couldn’t match Chinese companies cutting prices, and went bust. The biggest Chinese solar company, Hanergy, became a stock market darling. Its owner, Li Hejun, became the richest man in China. But Hanergy has just suffered a meltdown in Chinese stock markets after revelations of dodgy accounting. This should sober all those who have become euphoric about future solar prospects. At least some of the recent fall in solar prices has been due not just to subsidies but unsustainable price-cutting. Warning: falling solar prices can represent distress sales, not cost breakthroughs. Hopefully, a cost breakthrough will ultimately come. Yet that is not guaranteed. We should move forward modestly, starting with rooftop solar panels that eliminate transmission and distribution costs. We should experiment with new ideas like solar pumps for farmers: these can be economic if they replace free farm electricity. Apart from such experiments, we should go all out on solar power only after it is fully established as competitive, and even then only to the extent it does not disturb the grid. Otherwise we will be risking the entire edifice of Indian manufacturing on a bet that could go badly wrong.[/TD]
[/TR]
[/TABLE]
 